If you’re not
an engineer some of the calculations may escape you, but don’t worry the video
explains all the calculations in one go !!
Something to cheer up the Engineer in you.
Just to put you in the picture and keep
you up to date with the latest developments.
Below is a link to a short video of a
Pakistani pile driving construction technique!
The chant is also catchy!
Now, let's analyse the Engineering here:
6 men x 180 lbs = 1080 lbs static force.
Jumping up and down will create a 3 times
dynamic effect = 3240 lbs/jump = 1.6 ton thumps if the pile is tapered to 2 in
x 2 in, cross section at the tip = 4 sq. in. So, dynamic pressure/thump at pile
tip = 3240/4 = 800 psi.
"Add a man" feature will
increase to 950 psi, so buy the option!
Increase the chant and dynamic force goes
up to 5 times to bring max.
pressure / thump to 1600 psi for a 7 man team.
Quite good, and will penetrate hard clay
and sandy soil (but not hard or rocky ground!) Pretty ingenious.
Oh, the foreman is the guy on the tambourine.
https://www.youtube-nocookie.com/embed/cFb0nLCKypg?rel=0
Oh, the foreman is the guy on the tambourine.
https://www.youtube-nocookie.com/embed/cFb0nLCKypg?rel=0